Southfield, MI (New building circa 2017)
Project managed by Rand Construction
Aluminum frames by J. Sussman Inc.
LED lighting provided by Halper Lighting Solutions
Scope of project included:
- Removal of windows in original building located in the shul, which included an 8′ skylight and 12 satellite panels, 14 aisle windows, and 5 Prayer Room windows
- Re-sizing windows as needed
- Removing bulges, removing ineffective re-bar and replacing with properly sized bar, replacing cracked/broken glass, re-soldering, re-cementing panels
- Re-installing panels and protective Lexan into newly installed aluminum frames
- Documenting and crating panels not installed to be sold