Akiva Hebrew Day School

Southfield, MI (New building circa 2017)

 

Project managed by Rand Construction

Aluminum frames by J. Sussman Inc.
LED lighting provided by Halper Lighting Solutions

Scope of project included:

  • Removal of windows in original building located in the shul, which included an 8′ skylight and 12 satellite panels, 14 aisle windows, and 5 Prayer Room windows
  • Re-sizing windows as needed
  • Removing bulges, removing ineffective re-bar and replacing with properly sized bar, replacing cracked/broken glass, re-soldering, re-cementing panels
  • Re-installing panels and protective Lexan into newly installed aluminum frames
  • Documenting and crating panels not installed to be sold